You are here

Spring 2021 IADC WellSharp certification

Top Stories

UL PETE Students Attended the 2021 IADC Annual General Meeting

UL Lafayette Petroleum Engineering students attended the IADC annual general meeting in Dallas from Nov 3 - Nov 5.

Read More ➝

UL Petroleum Engineering student team wins 2nd place in the Nation in the 2021 SPE Petrobowl competition

The Petroleum Engineering Department’s Petrobowl Club took 2nd place, in the nation, at the 2021 Society of Petroleu

Read More ➝

IADC Student Chapter Featured in the IADC DrillBits Monthly Newsletter

UL Lafayette, IADC are featured in IADC DrillBits monthly newsletter once again (December 2020, this time).

Read More ➝

As in every end of a semester, UL Lafayette Petroleum Engineering students completed their IADC WellSharp Level 2 certification after a 2-day course this weekend (5/8-5/9).  With the IADC minimum passing requirement of 75 %, the class average was 88 %, with one student achieving a perfect score of 100 %.  A face-to-face Well Control education was delivered to the students providing the finest education in the nation on this important topic.

Masks were only taken off for the photo below, highlighting the smiling faces of the certified students.

SHARE THIS |