UL Lafayette Petroleum Engineering students demonstrated their expertise by successfully completing the IADC WellSha
Baker Hughes completion tools facility tour
Fri, 03/15/2019 - 8:01pmOn March 15th, UL Lafayette Petroleum Engineering went once again on an industry facility tour to Baker Hughes completions. The tour covered: packer assemblies, intervention tools, subsurface safety valves, tubing conveyed perforating systems, drill bits, product QA/QC, etc. They stressed the importance of completion hydraulics to our students and connected once again the theory taught in classes to real world applications.