You are here

Big E Drilling Rig 4 Field Trip

Top Stories

Workstrings International Facility Tour

Students from UL's Petroleum Engineering program enjoyed an informative and engaging tour of the Workstrings Interna

Read More ➝

UL PETE Students attending IADC HSE&T Conference & Exhibition

Petroleum Engineering students from UL Lafayette attended the IADC HSE&T Conference held in Houston On February

Read More ➝

Celebrating Four Decades of Excellence: Rick Farmer's Impact on Drilling and Completions in the Oilfield

Within our Petroleum Engineering Department, we are fortunate to have exceptional industry professionals as part of

Read More ➝

UL Lafayette Petroleum Engineering students visited Big E Drilling Rig 4 on Friday, January 26th.  Drilling ahead at over 16,500’ directional for gas to 24,500’.  They saw all operations – RSS (rotary steerable system), MWD/LWD, MPD, mud testing, mud coolers, well control components, etc.  They toured all around the rig, even on the rig floor while drilling.  Many thanks to LLOX for this opportunity.

 

SHARE THIS |