You are here

Parker Drilling Rig 55B Visit

Top Stories

UL Lafayette Petroleum Engineering Students Visit Halliburton Integrated Completions Center

On April 11, Petroleum Engineering students from the University of Louisiana at Lafayette had the opportunity to tou

Read More ➝

UL Lafayette Petroleum Engineering Students Visit Moncla Well Service Facility

On April 4, students from the University of Louisiana at Lafayette’s Petroleum Engineering program had the incredibl

Read More ➝

UL Lafayette Petroleum Engineering Students Visit Coastal Drilling Rig 21

On Friday, February 28, UL Lafayette Petroleum Engineering students had the unique opportunity to visit Coastal Dril

Read More ➝

On Friday September 21st, 28 UL PETE students went visiting a 2,000 HP barge rig, Parker Drilling Rig 55B, in Amelia, LA. The students had the opportunity to actually see the equipment they have been told about in the drilling class and lab (Accumulators, BOPs, top drives, pumps, solids control, etc.).

SHARE THIS |